NOTE: This functionality is currently being trialled in Auckland, before a wider rollout.
What is the Transport Disruption Assessment Report (TDA)?
The TDA report enables RCAs and others to run location based reports which will find projects within the selected location which are intersecting with a transport layer.
How do I use it?
- Head to your dashboard, and click ‘Create Report’.
- Select ‘Transport Disruption Assessment Report’.
- This opens up a report panel – here you can select an address or area (eg. 1 King Street, or Northcote), or draw your own boundary on the map.
- Click ‘create report’
- This will bring up a list of all projects which intersect with at least 1 transport layer as determined in the TDA.
- If you click on a project in the report, this will bring up the project summary page of the project you clicked on. To get back to the report, click the back button on your browser.
- If you want to refer back to the report, and for the report to continually add projects which meet your report criteria, you will need to save the report.
- Click save, and choose a report name.
- Once the report is saved, you will be able to find it in your dashboard under ‘My Saved Reports’
If the report says there are no projects, this is either because there are no layers loaded in for your region, or there are no projects intersecting with layers in your region.
We are continually improving this report and will be making updates to it over the next 6 months.